Density Test Report

Date :05/10/2023
Project No :2022C113
Client Company :CWM
Arrival Time :05/10/2023 8:00
Onsite Hours :04:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :cloudy
Departure Time :05/10/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/10/2023 1 3 135.0 GAB 23411 140.2 5.7 96.3 90 D6938 Pass
Location : 172 feet to west of MH#1, Elv/Depth :@finish grade
Comment : test result is on standby until receive proctor from lab Gauge Serial No. :85759
05/10/2023 2 3.7 136.1 GAB 23411 140.2 5.7 97.1 90 D6938 Pass
Location : 117 feet to west of MH#1, Elv/Depth :at finish grade
Comment : test result is on standby until receive proctor from lab Gauge Serial No. :85759
05/10/2023 3 3.6 134.4 GAB 23411 140.2 5.7 95.9 90 D6938 Pass
Location : 73 feet to west of MH#1, Elv/Depth :at finish grde
Comment : test result is on standby until receive proctor from lab Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, May 10, 2023
Reviewer Name / DateRamchandra Mogulla, July 10, 2023