Skip to content

Density Test Report

Date :05/15/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :05/15/2023 06:30
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Clear skies
Departure Time :05/15/2023 16:30
ASEC Technician Name :Ramchandra Mogulla

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/15/2023 1 16.8 109.5 ASEC-2 110.9 15.3 Check
Location : Section 2 , Elv/Depth :252
Comment :
05/15/2023 2 14.6 110.9 ASEC-2 110.9 15.3 100.0 90 D6938 Pass
Location : Section 2 Lift 8, See drawing, Elv/Depth :253
Comment : Gauge Serial No. :30942
05/15/2023 3 17.2 109.7 ASEC-2 110.9 15.3 98.9 90 D6938 Pass
Location : Section 2 Lift 8, See drawing, Elv/Depth :252
Comment : Gauge Serial No. :30942
05/15/2023 4 16.3 109.5 ASEC-2 110.9 15.3 98.7 90 D6938 Pass
Location : Section 1 Lift 11, Elv/Depth :257
Comment : Gauge Serial No. :30942
Technician Signature / DateRamchandra Mogulla, May 15, 2023