- Home
- Daily Field Report Report ID: 59314
- This project is inactive from admin.Download Report
Daily Field Report
Date :05/15/2023
Project No :2023C118
Client Company :CWM
Arrival Time :05/15/2023 07:30
Onsite Hours :11:00
Name of the Project :Concourse D Widening
Project Location :HJAIA
Weather :sunny/cloudy
Departure Time :05/15/2023 18:30
ASEC Technician Name :Isaac Davis
Observations/Finding
As requested, our ASEC representative was on site to observe the placement of concrete for Sequence 3 (between Gates 3 and 5). A sample of fresh concrete was obtained and various testing conducted. Results are stated below.
Project: Concourse D
Location: Sequence 3 between gates 3 and 5
Ambient temperature: 74 degrees F
First sample taken:
Slump = 2 inches
Air Content = 3.5%
Concrete temperature = 70 degrees F
Unit Weight = 146.4 pcf
Test #1 @90 cubic yards:
Slump = 2.5
Air Content = 5%
Concrete temperature = 68 degrees F
Unit Weight = 146.6 pcf
Placed 2 loggers in lane.
#1 logger on north end
#2 logger on south end
Technician Signature / DateIsaac Davis, May 15, 2023