Daily Field Report

Date :05/15/2023
Project No :2023C118
Client Company :CWM
Arrival Time :05/15/2023 07:30
Onsite Hours :11:00
Name of the Project :Concourse D Widening
Project Location :HJAIA
Weather :sunny/cloudy
Departure Time :05/15/2023 18:30
ASEC Technician Name :Isaac Davis

Observations/Finding

As requested, our ASEC representative was on site to observe the placement of concrete for Sequence 3 (between Gates 3 and 5).  A sample of fresh concrete was obtained and various testing conducted.  Results are stated below.

Project:  Concourse D

Location:  Sequence 3 between gates 3 and 5

Ambient temperature:  74 degrees F

First sample taken:

Slump = 2 inches

Air Content = 3.5%

Concrete temperature = 70 degrees F

Unit Weight = 146.4 pcf

 

Test #1 @90 cubic yards:

Slump = 2.5

Air Content = 5%

Concrete temperature = 68 degrees F

Unit Weight = 146.6 pcf

Placed 2 loggers in lane.

#1 logger on north end

#2 logger on south end

 

 

 

Technician Signature / DateIsaac Davis, May 15, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023