Density Test Report

Date :05/23/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :05/24/2023 01:30
Onsite Hours :04:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :overcast
Departure Time :05/24/2023 05:30
ASEC Technician Name :Isaac Davis

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/24/2023 1 10.3 115.1 M10 119.0 11.4 96.7 90 D6938 Pass
Location : DOA 17A, Elv/Depth :Approximately -2 feet below grade
Comment : Gauge Serial No. :
05/24/2023 2 3.4 117.1 M10 119.0 11.4 98.4 95 D6938 Pass
Location : DOA 17A, Elv/Depth :Approximately -1 foot below grade
Comment : Gauge Serial No. :
05/24/2023 2R 6.4 115.7 M10 119.0 11.4 97.2 95 D6938 Pass
Location : DOA 17A, Elv/Depth :Approximately -1 foot below grade
Comment : Gauge Serial No. :
05/24/2023 3 7 113.5 M10 119.0 11.4 95.4 95 D6938 Pass
Location : DOA 17A, Elv/Depth :Approximately - 6 inches below grade
Comment : Gauge Serial No. :
Technician Signature / DateIsaac Davis, May 23, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023