- Home
- Density Test Report Report ID: 59415
- Edit Download Report
Density Test Report
Date :05/20/2023
Project No :2022C106
Client Company :CWM
Arrival Time :05/20/2023 12:00
Onsite Hours :04:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :cloudy
Departure Time :05/20/2023 16:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
05/20/2023 | 1 | 4.5 | 133.5 | Infinity | D6938 | Pass | ||||
Location : | at shoulder of taxi way 6B close to the edge of Lane 5. , Elv/Depth :at finish grade | |||||||||
Comment : | result on hold for proctor | Gauge Serial No. :85759 | ||||||||
05/20/2023 | 2 | 6.1 | 133.6 | Infinity | D6938 | Pass | ||||
Location : | at shoulder taxi way 6B close to lane 4., Elv/Depth :at finish grade | |||||||||
Comment : | result on hold for proctor | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, May 20, 2023
Reviewer Name / DateKenneth Mosman, September 25, 2023