Skip to content

Daily Field Report

Date :05/23/2023
Project No :2023C136
Client Company :Excellere
Arrival Time :05/22/2023 7:30
Onsite Hours :05:30
Name of the Project :Big Creek Boardwalks
Project Location :Alpharetta
Weather :sunny
Departure Time :05/22/2023 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe and monitor the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • Observed the drilling and installation of Helical piles and documented the results.  The results are attached on a separate report.
Technician Signature / DateAminullah Azimi, May 23, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023