Density Test Report

Date :05/26/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :05/26/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :05/26/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/26/2023 4 14.2 109.4 ASEC-2 110.9 15.3 Check
Location : Section-2 basement area G7, Elv/Depth :253
Comment :
05/26/2023 1 14.7 111.8 ASEC-2 110.9 15.3 100.8 90 D6938 Pass
Location : Section-1 basement area B7, Elv/Depth :258
Comment : Gauge Serial No. :30942
05/26/2023 2 14.8 112.7 ASEC-2 110.9 15.3 101.6 90 D6938 Pass
Location : Section-2 Basement area G7, Elv/Depth :254
Comment : Gauge Serial No. :30942
05/26/2023 3 15.8 113.0 ASEC-2 110.9 15.3 101.9 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :254
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, May 26, 2023
Reviewer Name / DateRamchandra Mogulla, June 05, 2023