Skip to content

Density Test Report

Date :05/25/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :05/25/2023 9:00
Onsite Hours :03:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :05/25/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/25/2023 1 28.5 85.0 P-01 100.4 18.6 84.7 90 D6938 Fail
Location : lot 417, Elv/Depth :16 feet below finish grade
Comment : Gauge Serial No. :85759
05/25/2023 2 30.1 81.4 P-01 100.4 18.6 81.1 90 D6938 Fail
Location : lot 416, Elv/Depth :9 feet below finish grade
Comment : Gauge Serial No. :85759
05/25/2023 3 24.3 114.2 P-01 100.4 18.6 113.7 90 D6938 Pass
Location : lot 415, Elv/Depth :3.5 feet below basement pad
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, May 25, 2023
Reviewer Name / DateRamchandra Mogulla, September 14, 2023