Daily Field Report

Date :05/24/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :05/24/2023 9:00
Onsite Hours :07:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :05/24/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

The placement and compaction of backfill soils for the roadway and Lots #415, 416 and 417 continued this day.

At the time of arrival, our representative observed that work was in progress with lifts being placed to about 20 feet below finished grade and compacted using a 810 compactor.

The density test results are on hold until a Moisture-Density Relationship can be performed.  In-place moisture contents were found to be high.

Technician Signature / DateAminullah Azimi, May 24, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023