Skip to content

Density Test Report

Date :06/01/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :06/01/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :06/01/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/01/2023 4 16.1 106.5 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :256
Comment :
06/01/2023 1 15.6 107.0 43409 107.5 17.8 99.5 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :259
Comment : Gauge Serial No. :30942
06/01/2023 2 15.7 109.3 43409 107.5 17.8 101.7 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :256
Comment : Gauge Serial No. :30942
06/01/2023 3 15.8 107.3 43409 107.5 17.8 99.8 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :256
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, June 1, 2023
Reviewer Name / DateRamchandra Mogulla, June 05, 2023