- Home
- Density Test Report Report ID: 59607
- Edit Download Report
Density Test Report
Date :06/02/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :06/02/2023 9:00
Onsite Hours :06:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :06/02/2023 15:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
06/02/2023 | 1 | 15.1 | 94.9 | P-01 | 100.4 | 18.6 | 94.5 | 90 | D6938 | Pass |
Location : | lot 417, Elv/Depth :8 feet below finish grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
06/02/2023 | 2 | 16.2 | 95.3 | P-01 | 100.4 | 18.6 | 94.9 | 90 | D6938 | Pass |
Location : | lot 416, Elv/Depth :3 feet below finish grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
06/02/2023 | 3 | 15.8 | 93.4 | P-01 | 100.4 | 18.6 | 93.0 | 90 | D6938 | Pass |
Location : | lot 415 , Elv/Depth :at basement finish grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, June 2, 2023
Reviewer Name / DateRamchandra Mogulla, September 14, 2023