Skip to content

Density Test Report

Date :06/09/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :06/09/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :06/09/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/09/2023 4 16.8 105.4 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :257
Comment :
06/09/2023 1 14.9 106.4 43409 107.5 17.8 99.0 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :260
Comment : Gauge Serial No. :30942
06/09/2023 2 14.7 105.8 43409 107.5 17.8 98.4 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :257
Comment : Gauge Serial No. :30942
06/09/2023 3 14.8 103.6 43409 107.5 17.8 96.4 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :257
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, June 9, 2023
Reviewer Name / DateRamchandra Mogulla, June 15, 2023