Density Test Report

Date :06/06/2023
Project No :2023C144
Client Company :CCG
Arrival Time :06/06/2023 8:00
Onsite Hours :07:30
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :cloudy
Departure Time :06/06/2023 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/06/2023 1 24 96.0 P-1 96.5 22.3 99.5 98 D6938 Pass
Location : Lot 30, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
06/06/2023 2 23.5 99.7 P-1 96.5 22.3 103.3 98 D6938 Pass
Location : Lot 29, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, June 6, 2023
Reviewer Name / DateKenneth Mosman, September 15, 2023