Density Test Report

Date :06/13/2023
Project No :2022C113
Client Company :CWM
Arrival Time :06/13/2023 7:00
Onsite Hours :11:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :cloudy
Departure Time :06/13/2023 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/13/2023 1 9.5 121.9 Recycled GAB 134.9 8.7 90.4 90 D6938 Pass
Location : 6 feet to east of proposed MH#1, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
06/13/2023 2 8.5 128.6 Recycled GAB 134.9 8.7 95.3 95 D6938 Pass
Location : 11 feet to east of prop MH1, Elv/Depth :138.3
Comment : Gauge Serial No. :85759
06/13/2023 3 8.6 139.3 Recycled GAB 134.9 8.7 95.1 95 D6938 Pass
Location : 7 feet to east of pro MH#1, Elv/Depth :6" below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, June 13, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023