Skip to content

Density Test Report

Date :06/20/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :06/20/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :06/20/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/20/2023 4 15.9 106.0 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :257
Comment :
06/20/2023 1 15.0 107.1 43409 107.5 17.8 99.6 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :262
Comment : Gauge Serial No. :30942
06/20/2023 2 14.6 111.3 43409 107.5 17.8 103.5 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :257
Comment : Gauge Serial No. :30942
06/20/2023 3 15.5 111.9 43409 107.5 17.8 104.1 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :257
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, June 20, 2023
Reviewer Name / DateRamchandra Mogulla, June 28, 2023