- Home
- Density Test Report Report ID: 59855
- This project is inactive from admin.Download Report
Density Test Report
Date :06/20/2023
Project No :2022C113
Client Company :CWM
Arrival Time :06/20/2023 8:30
Onsite Hours :07:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :cloudy
Departure Time :06/20/2023 15:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
06/20/2023 | 1 | 8.1 | 138.7 | Recycled GAB | 134.9 | 8.7 | 95.1 | 95 | D6938 | Pass |
Location : | 11 feet to west of propose MH#1, Elv/Depth :at finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
06/20/2023 | 2 | 10.1 | 114.0 | 23347 | 119.7 | 13.0 | 95.2 | 90 | D6938 | Pass |
Location : | at Jock and Pit., Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, June 20, 2023
Reviewer Name / DateKenneth Mosman, July 09, 2023