Skip to content

Density Test Report

Date :06/30/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :06/30/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :06/30/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/30/2023 4 14.0 109.0 ASEC-2 110.9 15.3 Check
Location : Section 2 basement area G7, Elv/Depth :254
Comment :
06/30/2023 1 14.8 108.1 ASEC-2 110.9 15.3 97.5 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :263
Comment : Gauge Serial No. :30942
06/30/2023 2 14.3 111.8 ASEC-2 110.9 15.3 100.8 90 D6938 Pass
Location : Section 2 basement area G7 , Elv/Depth :254
Comment : Gauge Serial No. :30942
06/30/2023 3 16.3 107.9 ASEC-2 110.9 15.3 97.3 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :254
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, June 30, 2023
Reviewer Name / DateRamchandra Mogulla, July 06, 2023