Skip to content

Daily Field Report

Date :07/06/2023
Project No :2023C144
Client Company :CCG
Arrival Time :07/06/2023 08:00
Onsite Hours :10:45
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :Cloudy
Departure Time :07/06/2023 18:40
ASEC Technician Name :Vidal Shengan

Observations/Finding

Our AS Engineering and Consulting (ASEC) representative visited the Carodel Farms site to conduct quality control inspection and testing services. Visual observation techniques were employed to ensure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on-site:

  1. Topsoil Placement: The contractor has placed compacted topsoil within the undisturbed buffer zone, as referenced on sheet C 0.1. The quality control representative visually inspected the placement and determined it to be in compliance with project requirements. No issues were noted during the observation.
  2. HDPE Pipe Installation: The contractor has installed HDPE (High-Density Polyethylene) pipe in accordance with the specifications outlined on sheet number C13.10. Section C3 of the pipe has been successfully placed. The quality control representative visually inspected the installation and confirmed that it was executed in accordance with the project requirements. No deviations or concerns were observed during the inspection.
Technician Signature / DateVidal Shengan, July 6, 2023
Reviewer Name / DateKenneth Mosman, July 30, 2023