Density Test Report

Date :07/10/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :07/10/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :PARTLY CLOUDY
Departure Time :07/10/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/10/2023 4 15.2 109.5 ASEC-2 110.9 15.3 Check
Location : Section 2 basement area G7, Elv/Depth :255
Comment :
07/10/2023 1 15.6 110.6 ASEC-2 110.9 15.3 99.7 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :267
Comment : Gauge Serial No. :30942
07/10/2023 2 15.5 111.8 ASEC-2 110.9 15.3 100.8 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :255
Comment : Gauge Serial No. :30942
07/10/2023 3 15.1 111.8 ASEC-2 110.9 15.3 100.8 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :262
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, July 10, 2023
Reviewer Name / DateRamchandra Mogulla, July 20, 2023