Density Test Report

Date :07/13/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :07/13/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :PARTLY CLOUDY
Departure Time :07/13/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/13/2023 4 18.8 103.1 46268 105.1 18.6 Check
Location : Section 1 basement area B7, Elv/Depth :265
Comment :
07/13/2023 1 16.4 107.6 46268 105.1 18.6 102.4 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :265
Comment : Gauge Serial No. :30942
07/13/2023 2 17.3 126.3 46268 105.1 18.6 102.5 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :261
Comment : Gauge Serial No. :30942
07/13/2023 3 16.6 108.7 46268 105.1 18.6 103.4 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :261
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, July 13, 2023
Reviewer Name / DateRamchandra Mogulla, July 20, 2023