Skip to content

Density Test Report

Date :07/18/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :07/18/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :07/18/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/18/2023 4 18.4 103.0 46268 105.1 18.6 Check
Location : Section 1 basement area B7, Elv/Depth :265
Comment :
07/18/2023 1 17.0 107.0 46268 105.1 18.6 101.8 90 D6938 Pass
Location : Basement area B7, Elv/Depth :265
Comment : Gauge Serial No. :30942
07/18/2023 2 17.9 107.1 46268 105.1 18.6 101.9 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :261
Comment : Gauge Serial No. :30942
07/18/2023 3 17.5 108.2 46268 105.1 18.6 102.9 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :263
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, July 18, 2023
Reviewer Name / DateRamchandra Mogulla, July 20, 2023