Skip to content

Density Test Report

Date :07/18/2023
Project No :2023C144
Client Company :CCG
Arrival Time :07/18/2023 08:30
Onsite Hours :07:30
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :Cloudy
Departure Time :07/18/2023 16:00
ASEC Technician Name :Vidal Shengan

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/18/2023 1 24.8 88.1 P-1 96.5 22.3 91.3 95 D6938 Fail
Location : Lot 58, Elv/Depth :3 feet below finished grade
Comment : scarify, recompact and retesting required Gauge Serial No. :3430
Technician Signature / DateVidal Shengan, July 18, 2023
Reviewer Name / DateKenneth Mosman, September 15, 2023