Concrete Test Report

Date :07/19/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :07/19/2023 6:30
Onsite Hours :01:30
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :sunny
Departure Time :07/19/2023 8:00
ASEC Technician Name :Aminullah Azimi

Concrete Placement Information

Location(S): N/A
Testing: A Set of concrete specimens (6 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
A Sets of concrete specimens/ 6 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:

Field Test Data

Set Number :A
Date Sampled :07/19/2023
Sampled By :Aminullah Azimi
Contractor :BBH
Truck Number :9066921
Time Batched :6:44
Location of Placement :vault 3
Number of samples cast :6
Ambient Temperature (°f) :73
Slump (in.) :3.5
Water added (gal.) :N/A
Laboratory Number :A
Time Sampled :7:25
Weather Condition :sunny
Concrete Supplier :ernst
Mix ID :45CA65
Quantity of Load (cu. yd.) :9
Sample Cast :A
Specified Strength :4500
Concrete Temperature(°f) :91
Air Content (%) :4.5
Unit Weight (pcf) :N/A

Strength Test Results

Specimen Number Scheduled Test Date Date Tested Age (days) Dia(in.) Area (sq in.) Maximum Loads (lbf) Strength (lbs) % Design Strength Type of Fracture
A 07/21/2023 07/19/2023 0

UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.

(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed

Technician Signature / DateAminullah Azimi, July 19, 2023
Reviewer Name / DateKenneth Mosman, July 30, 2023