Daily Field Report

Date :07/20/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :07/20/2023 8:00
Onsite Hours :9:30
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :07/20/2023 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe and monitor the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

Our representative observed the drilling of rock and documented the results.  Results are attached in a separate report.

Technician Signature / DateAminullah Azimi, July 20, 2023
Reviewer Name / DateKenneth Mosman, July 30, 2023