Density Test Report

Date :07/28/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :07/28/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :07/28/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/28/2023 1 16.9 106.7 46268 105.1 18.6 101.5 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :270
Comment : Gauge Serial No. :30942
07/28/2023 2 17.1 100.2 46268 105.1 18.6 95.3 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :262
Comment : Gauge Serial No. :30942
07/28/2023 3 16.9 104.4 46268 105.1 18.6 99.3 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :262
Comment : Gauge Serial No. :30942
07/28/2023 4 17.5 103.7 46268 105.1 18.6 Check
Location : Section 2 basement area G7, Elv/Depth :262
Comment :
Technician Signature / DateAvinash Bandham, July 28, 2023