Skip to content

Density Test Report

Date :08/08/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :08/08/2023 06:30
Onsite Hours :07:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Partly cloudy, rain
Departure Time :08/08/2023 13:30
ASEC Technician Name :Ramchandra Mogulla

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/08/2023 1 17.8 110.3 ASEC-2 110.9 15.3 Check
Location : See attached plan drawing, Elv/Depth :265
Comment :
08/08/2023 2 19.2 108.1 ASEC-2 110.9 15.3 97.5 90 D6938 Pass
Location : See attached plan drawing, Elv/Depth :271.5
Comment : Gauge Serial No. :30942
08/08/2023 3 17.6 112.2 ASEC-2 110.9 15.3 101.2 90 D6938 Pass
Location : See attached plan drawing, Elv/Depth :265
Comment : Gauge Serial No. :30942
08/08/2023 4 19.3 109.0 ASEC-2 110.9 15.3 98.3 90 D6938 Pass
Location : See attached plan drawing, Elv/Depth :266.5
Comment : Gauge Serial No. :30942
Technician Signature / DateRamchandra Mogulla, August 8, 2023