Daily Field Report

Date :08/21/2023
Project No :2023C159
Client Company :CW Matthews
Arrival Time :08/21/2023 7:00
Onsite Hours :9:00
Name of the Project :Airfield Repairs 2021-23
Project Location :HJAIA, Atlanta, GA
Weather :sunny
Departure Time :08/21/2023 16:00
ASEC Technician Name :

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • A pre-pour observation was performed in the Airfield repair phase 7, Ramp 6 S, Storm drains portions of the project this day.  The contractor completed rebar and dowel placement for these repair locations.
  • The writer visually inspected the installation and setup of these Storm drains and advised the contractor representatives of any minor corrections that were required.
  • Contractor cleaned loose rock and debris from the base.
  • Our representative along with Selim of 2MNEXT and the ATLNex representative Cornel and CWM Rep Tim signed the pre-pour card.
  • and also observed the placement of concrete for Storm drains repairs.

Technician Signature / DateAminullah Azimi, August 21, 2023
Reviewer Name / DateRamchandra Mogulla, September 05, 2023