Date :08/23/2023
Project No :2023C136
Client Company :Excellere
Arrival Time :08/23/2023 09:30
Onsite Hours :03:30
Name of the Project :Big Creek Boardwalks
Project Location :Alpharetta
Weather :Sunny
Departure Time :08/23/2023 13:00
ASEC Technician Name :Ramchandra Mogulla

Observations/Finding

AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Ram Mogulla visited the site at the request of Excellere Construction representative Martha Herrera. The undersigned representative was present to verify bolted connections that were installed along the Mansell spur section of the project between Bent 11 and the concrete abutment closest to Bent 15.

During the visit, the following observations were made:

  1. Bolted Connections:
    • Inspected bolted connections at the designated locations for adherence to specific criteria, including bearing, bolt placement, and complete nut engagement.
    • Verified that the bolted connections within the area inspected as mentioned above appeared to be acceptable and are in general accordance with the relevant AISC/RCSC code requirements as well as the project specifications for snug-tight conditions.
  1. Beam-Column Moment Connection Inspection:
    • Examined bolted beam to column moment connections within the inspection area as mentioned above.
    • Verified the fastener assemblies within these bolted beam connections to ensure alignment with contract requirements pertaining to size, components, assembly order, and orientation.
    • Confirmed that the fastener assemblies exhibit a snug-tight condition, consistent with the project drawings.

Conclusion: The site visit conducted on August 23, 2023, provided an assessment of ongoing project activities for the Big Creek Board Walk. The observations made during the visit attest to the compliance of bolted connections for snug-tight conditions with relevant industry standards and the acceptable condition of the examined beam-column moment connections.

If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have.

 

 

Technician Signature / DateRamchandra Mogulla, August 23, 2023
Reviewer Name / DateKenneth Mosman, September 15, 2023