Skip to content

Density Test Report

Date :08/23/2023
Project No :2023C144
Client Company :CCG
Arrival Time :08/23/2023 8:00
Onsite Hours :05:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :08/23/2023 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/23/2023 1 26.3 92.1 P-1 96.5 22.3 95.4 95 D6938 Pass
Location : STA 0+40.00, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
08/23/2023 2 25.7 91.6 P-1 96.5 22.3 94.9 95 D6938 Fail
Location : STA 0+80.00, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
Check
Location : , Elv/Depth :
Comment :
Technician Signature / DateAminullah Azimi, August 23, 2023
Reviewer Name / DateKenneth Mosman, September 17, 2023