Skip to content

Density Test Report

Date :08/24/2023
Project No :2023C144
Client Company :CCG
Arrival Time :08/24/2023 7:30
Onsite Hours :06:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :08/24/2023 13:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/24/2023 1 26.2 91.6 P-1 96.5 22.3 94.9 95 D6938 Fail
Location : STA 2+60.00, Elv/Depth :13.5 feet below finished grade
Comment : Gauge Serial No. :85759
08/24/2023 2 25 94.0 P-1 96.5 22.3 97.4 95 D6938 Pass
Location : STA 1+60.00, Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :85759
08/24/2023 3 20.1 99.5 P-1 96.5 22.3 103.1 95 D6938 Pass
Location : STA 0+40.00, Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :85759
08/24/2023 4 26.8 92.4 P-1 96.5 22.3 95.8 95 D6938 Pass
Location : STA 0+60.00, Elv/Depth :13.5 feet below finished grade
Comment : Gauge Serial No. :85759
08/24/2023 5 24.7 93.5 P-1 96.5 22.3 96.9 95 D6938 Pass
Location : STA 1+80.00, Elv/Depth :13.5 feet below finished grade
Comment : Gauge Serial No. :85759
08/24/2023 6 27 94.5 P-1 96.5 22.3 97.9 95 D6938 Pass
Location : STA 2+40.00, Elv/Depth :13 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, August 24, 2023
Reviewer Name / DateKenneth Mosman, September 17, 2023