Skip to content

Density Test Report

Date :09/01/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :09/01/2023 13:30
Onsite Hours :03:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :cloudy
Departure Time :09/01/2023 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/01/2023 1 17.4 99.3 P-01 100.4 18.6 98.9 95 D6938 Pass
Location : 26 feet to NE of MH G6., Elv/Depth :3.5 feet below finish grade
Comment : Gauge Serial No. :85759
09/01/2023 2 17.4 100.3 P-01 100.4 18.6 99.9 90 D6938 Pass
Location : 11 feet to SW of MH G6-A, Elv/Depth :3 feet below finish grade
Comment : Gauge Serial No. :85759
09/01/2023 3 16.8 98.6 P-01 100.4 18.6 98.2 90 D6938 Pass
Location : 18 feet to NW of MH G6., Elv/Depth :2 feet below finish grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 1, 2023
Reviewer Name / DateRamchandra Mogulla, September 14, 2023