Density Test Report

Date :09/01/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/01/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :PARTLY CLOUDY
Departure Time :09/01/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/01/2023 4 13.9 108.9 ASEC-2 110.9 15.3 Check
Location : Section 2 basement area G7, Elv/Depth :275
Comment :
09/01/2023 1 16.5 106.1 ASEC-2 110.9 15.3 95.7 95 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :275
Comment : Gauge Serial No. :30942
09/01/2023 2 15.6 107.4 ASEC-2 110.9 15.3 96.8 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :275
Comment : Gauge Serial No. :30942
09/01/2023 3 16.8 109.0 ASEC-2 110.9 15.3 98.3 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :275
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, September 1, 2023
Reviewer Name / DateRamchandra Mogulla, September 15, 2023