Skip to content

Density Test Report

Date :09/07/2023
Project No :2023C144
Client Company :CCG
Arrival Time :09/07/2023 8:00
Onsite Hours :10:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :09/07/2023 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/07/2023 1 19.9 95.6 P-1 96.5 22.3 99.1 95 D6938 Pass
Location : Retaining wall B, STA 0+40.00, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :85759
09/07/2023 2 21.5 98.8 P-1 96.5 22.3 102.4 95 D6938 Pass
Location : Retaining wall B, STA 0+60.00, Elv/Depth :10.5 feet below finished grade
Comment : Gauge Serial No. :85759
09/07/2023 3 22.1 95.7 P-1 96.5 22.3 99.2 95 D6938 Pass
Location : Retaining wall B, STA 0+20.00, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :85759
09/07/2023 4 21.3 97.0 P-1 96.5 22.3 100.5 90 D6938 Pass
Location : Storm line between MH15 and MH 16, 25 feet to West of MH 15, , Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
09/07/2023 5 20.9 96.1 P-1 96.5 22.3 99.6 90 D6938 Pass
Location : Storm line between MH15 and MH16, 87 feet to East of MH 15., Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
09/07/2023 6 20.2 99.1 P-1 96.5 22.3 102.7 90 D6938 Pass
Location : Storm line Between MH15 and MH 16, 111 feet to East of MH 15,, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :85759
09/07/2023 7 18.3 95.4 P-1 96.5 22.3 98.9 90 D6938 Pass
Location : Storm line between MH 15 and MH 16, 14 feet to East of MH 15,, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 7, 2023