Skip to content

Density Test Report

Date :09/07/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/07/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/07/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/07/2023 4 16.2 105.9 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :275
Comment :
09/07/2023 1 17.7 104.7 43409 107.5 17.8 97.4 95 D6938 Pass
Location : basement area B7, Elv/Depth :277
Comment : Gauge Serial No. :30942
09/07/2023 2 16.6 104.0 43409 107.5 17.8 96.7 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :275
Comment : Gauge Serial No. :30942
09/07/2023 3 15.8 104.4 43409 107.5 17.8 97.1 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :275
Comment : Gauge Serial No. :309412
Technician Signature / DateAvinash Bandham, September 7, 2023
Reviewer Name / DateRamchandra Mogulla, September 18, 2023