Skip to content

Density Test Report

Date :09/11/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/11/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/11/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/11/2023 4 16.9 106.1 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :275.5
Comment :
09/11/2023 1 15.9 103.8 43409 107.5 17.8 96.6 95 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :276
Comment : Gauge Serial No. :30942
09/11/2023 2 16.4 105.3 43409 107.5 17.8 98.0 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :276
Comment : Gauge Serial No. :30942
09/12/2023 3 17.5 103.7 43409 107.5 17.8 96.5 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :276
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, September 11, 2023
Reviewer Name / DateRamchandra Mogulla, September 25, 2023