Density Test Report

Date :09/12/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/12/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/12/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/12/2023 4 16.1 109.1 ASEC-2 110.9 15.3 Check
Location : Section 2 basement area G&, Elv/Depth :276
Comment :
09/12/2023 1 16.5 108.8 ASEC-2 110.9 15.3 98.1 95 D6938 Pass
Location : Section 1 basement area B7`, Elv/Depth :276
Comment : Gauge Serial No. :30942
09/12/2023 2 16.6 108.1 ASEC-2 110.9 15.3 97.5 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :276
Comment : Gauge Serial No. :30942
09/12/2023 3 16.5 109.3 ASEC-2 110.9 15.3 98.6 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :276
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, September 12, 2023
Reviewer Name / DateRamchandra Mogulla, September 25, 2023