Skip to content

Density Test Report

Date :09/18/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/18/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/18/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/18/2023 3 16.9 107.4 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :278
Comment :
09/18/2023 1 16.3 108.8 43409 107.5 17.8 101.2 95 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :278
Comment : Gauge Serial No. :30942
09/18/2023 2 16.6 109.4 43409 107.5 17.8 101.8 95 D6938 Pass
Location : Section 2 basement area G7 , Elv/Depth :278
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, September 18, 2023
Reviewer Name / DateRamchandra Mogulla, September 25, 2023