- Home
- Daily Field Report Report ID: 62042
- This project is inactive from admin.Download Report
Daily Field Report
Date :09/26/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/26/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/26/2023 16:30
ASEC Technician Name :Avinash Bandham
Observations/Finding
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R8, E720659 S1-R8.)
- Transportation of material for structural fill has been stopped as an elevation of 280 ft was achieved.
- Material in the basement was worked on to level the area for further construction.
- The basement area was probed using the hand probe and six moisture density test were performed in the basement followed with a check-plug. The test locations were marked on the enclosed drawing.
- The geo-fabric was delivered to the site.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Hauling in the basement area
Hauling in the basement area
Company tags on the fabric
Company tags on the fabric
Geo-fabric received on site
Geo-fabric received on site
Technician Signature / DateAvinash Bandham, September 26, 2023
Reviewer Name / DateRamchandra Mogulla, October 12, 2023