Daily Field Report

Date :09/26/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/26/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/26/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R8, E720659 S1-R8.)

  1. Transportation of material for structural fill has been stopped as an elevation of 280 ft was achieved.
  2. Material in the basement was worked on to level the area for further construction.
  1. The basement area was probed using the hand probe and six moisture density test were performed in the basement followed with a check-plug. The test locations were marked on the enclosed drawing.
  2. The geo-fabric was delivered to the site.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Hauling in the basement area

Hauling in the basement area

Company tags on the fabric

Company tags on the fabric

Geo-fabric received on site

Geo-fabric received on site

Technician Signature / DateAvinash Bandham, September 26, 2023
Reviewer Name / DateRamchandra Mogulla, October 12, 2023