- Home
- Density Test Report Report ID: 62098
- This project is inactive from admin.Download Report
Density Test Report
Date :09/28/2023
Project No :2023C144
Client Company :CCG
Arrival Time :09/28/2023 8:00
Onsite Hours :08:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :09/28/2023 16:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
09/28/2023 | 1 | 28.9 | 90.6 | P-1 | 96.5 | 22.3 | 93.9 | 90 | D6938 | Pass |
Location : | Lot #107 , Elv/Depth :2 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
09/28/2023 | 2 | 28.2 | 92.2 | P-1 | 96.5 | 22.3 | 95.5 | 90 | D6938 | Pass |
Location : | Lot #108, Elv/Depth :2 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
09/28/2023 | 3 | 26.5 | 92.6 | P-1 | 96.5 | 22.3 | 96.0 | 90 | D6938 | Pass |
Location : | Lot #106, Elv/Depth :basement finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
09/28/2023 | 4 | 28 | 90.9 | P-1 | 96.5 | 22.3 | 94.2 | 90 | D6938 | Pass |
Location : | Lot #107, Elv/Depth :1.5 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
09/28/2023 | 5 | 28.3 | 92.0 | P-1 | 96.5 | 22.3 | 95.3 | 90 | D6938 | Pass |
Location : | Lot #108, Elv/Depth :8 inches below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
09/28/2023 | 6 | 27.3 | 92.5 | P-1 | 96.5 | 22.3 | 95.9 | 90 | D6938 | Pass |
Location : | Lot #107, Elv/Depth :8 inches below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, September 28, 2023
Reviewer Name / DateKenneth Mosman, October 08, 2023