Skip to content

Density Test Report

Date :10/06/2023
Project No :2023C144
Client Company :CCG
Arrival Time :10/06/2023 8:00
Onsite Hours :08:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :10/06/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/06/2023 1 19.8 94.4 P-1 96.5 22.3 97.8 90 D6938 Pass
Location : road to the north of Lot #11., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
10/06/2023 2 20 94.4 P-1 96.5 22.3 97.8 90 D6938 Pass
Location : road to the north of Lot #13., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
10/06/2023 3 20.9 94.5 P-1 96.5 22.3 97.9 90 D6938 Pass
Location : road to the of Lot #15., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
10/06/2023 4 20.1 88.4 P-1 96.5 22.3 91.6 90 D6938 Pass
Location : water storm trench, 51 feet to SE of MH 62, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :85759
10/06/2023 5 18.1 89.4 P-1 96.5 22.3 92.6 90 D6938 Pass
Location : Water storm trench, 21 feet to NW of MH 63,, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, October 6, 2023
Reviewer Name / DateKenneth Mosman, October 08, 2023