Skip to content

Daily Field Report

Date :08/02/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :08/02/2023 09:30
Onsite Hours :07:30
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :Clear skies
Departure Time :08/02/2023 17:00
ASEC Technician Name :Vidal Shengan

Observations/Finding

The above-mentioned AS Engineering and Consulting (ASEC) representative, visited the River Walk Manor site to conduct quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals.

The following observations were made on-site:

  • Rock Volume Determination for the blast performed on this date: Rock volume was determined based on the attached drill logs. Drilling was performed on the days leading to today and depths to top of rock and termination was recorded.
  • The total quantity of trench rock shot on this day was calculated to be 1891.3 cubic yards.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateRamchandra Mogulla, August 2, 2023
Reviewer Name / DateKenneth Mosman, October 22, 2023