Daily Field Report

Date :10/13/2023
Project No :2022C218
Client Company :CW Matthews
Arrival Time :10/13/2023 8:00
Onsite Hours :11:00
Name of the Project :Ramp 20 Pavement Replacement - IFB-1230102
Project Location :HJAIA
Weather :sunny
Departure Time :10/13/2023 19:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • LS concrete placement observation was performed in the Ramp 20, phase 1, lane 5, around utility panel 2 and panel 3, on this day.
  • Observed GAB placement and compaction south of slot drain from STA 0+00.00 to STA 2+50.00.
  • Performed straight edge for phase 1 (except lane 1, 4,5 and lane 6).

In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.

Technician Signature / DateAminullah Azimi, October 13, 2023
Reviewer Name / DateKenneth Mosman, October 22, 2023