Skip to content

Density Test Report

Date :10/18/2023
Project No :2023C144
Client Company :CCG
Arrival Time :10/18/2023 8:00
Onsite Hours :08:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :10/18/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/18/2023 1 29 89.5 P-1 96.5 22.3 92.7 90 D6938 Pass
Location : 30 feet to southof MH4., Elv/Depth :6 feet below finished grade
Comment : Moisture contents very high Gauge Serial No. :85759
10/18/2023 2 23.1 93.1 P-1 96.5 22.3 96.5 90 D6938 Pass
Location : 36 feet to north of MH 3., Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :85759
10/18/2023 3 26.7 91.5 P-1 96.5 22.3 94.8 90 D6938 Pass
Location : 23 feet to north of MH4., Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
10/18/2023 4 25.4 93.2 P-1 96.5 22.3 96.6 90 D6938 Pass
Location : 18 feet to north of MH 3,, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
10/18/2023 5 25.3 93.9 P-1 96.5 22.3 97.3 90 D6938 Pass
Location : 53 feet to south of MH 4., Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, October 18, 2023
Reviewer Name / DateKenneth Mosman, November 04, 2023