Skip to content

Density Test Report

Date :11/07/2023
Project No :2021C002
Client Company :CW Matthews
Arrival Time :11/07/2023 8:00
Onsite Hours :04:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :sunny
Departure Time :11/07/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/07/2023 1 7 120.5 16 124.0 8.7 97.2 90 D6938 Pass
Location : STA 7021+75, Elv/Depth :3.5 feet below finish grade
Comment : Gauge Serial No. :85759
11/07/2023 2 6.6 114.6 16 124.0 8.7 92.4 90 D6938 Pass
Location : STA 7021+75, Elv/Depth :1.5 feet below finish grade
Comment : Gauge Serial No. :85759
11/15/2023 3 6.8 116.4 16 124.0 8.7 93.9 90 D6938 Pass
Location : STA 7022+50, Elv/Depth :5 feet below finish grade
Comment : Gauge Serial No. :85759
11/07/2023 4 8.9 116.3 16 124.0 8.7 93.8 90 D6938 Pass
Location : STA 7022+50, Elv/Depth :4.5 feet below finish grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, November 7, 2023
Reviewer Name / DateKenneth Mosman, March 17, 2024