Skip to content

Density Test Report

Date :11/08/2023
Project No :2021C002
Client Company :CW Matthews
Arrival Time :11/08/2023 8:00
Onsite Hours :03:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :sunny
Departure Time :11/08/2023 11:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/08/2023 1 6.9 115.8 16 124.0 8.7 93.4 90 D6938 Pass
Location : STA 7022+00, Elv/Depth :1 foot below finish grade
Comment : Gauge Serial No. :85759
11/08/2023 2 11.7 114.5 16 124.0 8.7 92.3 90 D6938 Pass
Location : STA 7022+00, Elv/Depth :1.5 feet below finish grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, November 8, 2023
Reviewer Name / DateKenneth Mosman, March 17, 2024