Skip to content

Density Test Report

Date :12/06/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/06/2023 8:30
Onsite Hours :03:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/06/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/06/2023 1 15.6 106.2 24209 111.6 16.5 95.2 90 D6938 Pass
Location : Sower line 25 feet to West of MH A10., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
12/06/2023 2 16.7 103.5 24209 111.6 16.5 92.7 90 D6938 Pass
Location : Sewer line 45 feet to South of MH A11., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
12/06/2023 3 17.2 106.4 24209 111.6 16.5 95.3 90 D6938 Pass
Location : at road in the front of Lot #15, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
12/06/2023 4 18.7 102.5 24209 111.6 16.5 91.8 90 D6938 Pass
Location : Road in the front of Lot #17, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
12/06/2023 5 16.9 104.2 24209 111.6 16.5 93.4 90 D6938 Pass
Location : Sewer line 19 feet to East of MH A10, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 6, 2023
Reviewer Name / DateKenneth Mosman, March 08, 2024