Skip to content

Density Test Report

Date :12/08/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/08/2023 13:00
Onsite Hours :03:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :cloudy
Departure Time :12/08/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/08/2023 1 15.8 116.4 24209 111.6 16.5 90.1 90 D6938 Pass
Location : Water storm 42 feet east of MH 9G., Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :85759
12/08/2023 2 15.8 116.3 24209 111.6 16.5 90.0 90 D6938 Fail
Location : 17 feet to south of MH 9G., Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
12/08/2023 3 18.2 105.3 24209 111.6 16.5 94.4 90 D6938 Pass
Location : Sewer line, 48 feet to west of MH C1., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
12/08/2023 4 15.6 103.7 24209 111.6 16.5 92.9 90 D6938 Pass
Location : Sewer line 72 feet to east of MH C2., Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 8, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024