Skip to content

Density Test Report

Date :12/18/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/18/2023 12:00
Onsite Hours :03:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/18/2023 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/18/2023 1 18.9 105.4 24208 110.4 16.3 95.5 90 D6938 Pass
Location : water storm, 16 feet south of MH 9G., Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :85759
12/18/2023 2 18.8 106.1 24209 111.6 16.5 95.1 90 D6938 Pass
Location : water storm, 30 feet north of MH14A, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 18, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024