Skip to content

Daily Field Report

Date :12/19/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/19/2023 8:30
Onsite Hours :03:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/19/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • The placement and compaction of backfill soils for the sewer trench between MH C2 and MH C3, continued this day.
  • At the time of arrival, our representative observed that work was in progress with one (1) foot lifts being placed, compacted using a sheeps-foot compactor.
  • Density test results indicate that the compacted materials met the project requirement of 95% of the maximum dry density obtained by the (Standard Proctor ASTM 698).
  • A bearing pressure evaluation was performed by visual inspection and probing testing for the footings of retaining wall 6 and retaining wall 7,
  • During the evaluation, soft, muddy and some soils with some organics were encountered.  Recommended the removal of (25′ x 30′ x 7′ deep) of these unsuitable soils to reach suitable residual soils.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, December 19, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024