- Home
- Density Test Report Report ID: 63419
- Edit Download Report
Density Test Report
Date :12/19/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/19/2023 8:30
Onsite Hours :03:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/19/2023 12:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
12/19/2023 | 1 | 18.2 | 108.0 | 24209 | 111.6 | 16.5 | 96.8 | 95 | D6938 | Pass |
Location : | 41 feet west of MHC2,, Elv/Depth :1 foot below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
12/19/2023 | 2 | 16.3 | 106.4 | 24209 | 111.6 | 16.5 | 95.3 | 95 | D6938 | Pass |
Location : | 56 feet east of MHC3., Elv/Depth :1.5 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
D6938 | Fail | |||||||||
Location : | , Elv/Depth : | |||||||||
Comment : | Gauge Serial No. : |
Technician Signature / DateAminullah Azimi, December 19, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024